https://www.miningweekly.com

Axiom fully permitted for Isabel nickel project

20th September 2018

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Solomon Islands has formally granted Axiom Mining a lease over the San Jorge nickel deposit, paving the way for the ASX-listed company to start construction of the Isabel mine – one of the last known undeveloped world-class nickel laterite deposits.

The news sent Axiom’s stock surging 44% to A$0.14 a share on Wednesday, with the company affirming that its first shipment of ore is expected in the first quarter of next year.

“We are now able to commence the construction of the Isabel nickel project and the subsequent sustainable mining of this world-class asset. This is the first time that any company in the mining industry has been granted a mining lease for this project,” said CEO Ryan Mount.

Development and construction of the mine has begun, with upgrades of the exploration camp to a long-term mining camp having started. Roads and loading facilities are also being constructed.

The company is in “advanced” stages of finalising financing of the life-of-mine construction and development and said that negotiations should be concluded in the “coming weeks”.

The final government approval of the nickel laterite project comes at a time when companies are scrambling to invest in battery metal projects including nickel, copper, cobalt, lithium and rare earths, driven by the expectation that electric vehicle batteries will rejuvenate the sector.

                     

Edited by Creamer Media Reporter

Comments

Showroom

SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (12/04/2024)
12th April 2024 By: Martin Creamer
Magazine round up | 12 April 2024
Magazine round up | 12 April 2024
12th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.335 0.373s - 106pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: