Aura looks to cut costs at Swedish uranium project
PERTH (miningweekly.com) – Uranium hopeful Aura Energy is considering a smaller-scale development for its Haggan project, in Sweden, in an effort to cut back on capital costs.
A 2012 scoping study evaluated the construction of a 30-million-tonne-a-year operation, and estimated a price tag of $540-million and operating costs of $13.50/lb.
However, given the current market conditions, the company has now considered three smaller size options, namely 3.5-million tonnes a year, 5-million tonnes a year and 7.5-million tonnes a year.
Capital costs would range between $150-million and $250-million, while operating costs were estimated at between $21/lb and $25/lb for the smallest-scale operation and between $18/lb and $22/lb for the 7.5-million-tonne-a-year operation.
Aura MD Bob Beeson said that despite the initial smaller scale developments being considered, the company would still progress the Haggan project to its ultimate scale of 30-million tonnes a year.
“Haggan has many of the requirements of an exceptional, long-life mine - extensive near-surface, easy to mine mineralistion, an extractive technology ideally suited to its type of mineralisation, and located in a stable developed country with centuries of mining tradition.”
He added that the low capital and operating costs associated with the mine also made the project a strategic development, and a viable project for decades into the future.
The project currently has a Joint Ore Reserves Committee-compliant inferred resource of 800-million pounds of uranium oxide.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation