https://www.miningweekly.com

Augusta receives air permit for Arizona project

31st January 2013

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Dual-listed Augusta Resources has received the air quality permit for its Rosemont copper project from the Arizona Department of Environmental Quality.

The company said the permit, which stipulates the operating, monitoring and reporting parameters that Rosemont must comply with to meet all federal, state and local air quality requirements, represented the seventh critical permit required to start construction.

Only one more permit remained to be obtained, which is the Clean Water Act Section 404 permit from the US Army Corp of Engineers, which the company expects to receive upon the issuance of the record of decision on the plan of operations from the US Forest Service.

"Having received one of the last permits remaining represents a major achievement for the Rosemont Copper project as we near the end of the permitting process and prepare for construction this year. This success demonstrates our commitment to set high standards for environmental protection by operating with enhanced emission controls that go beyond regulatory requirements,” CEO Gil Clausen said.

The project is expected to produce 221-million pounds of copper a year, which could account for as much as 10% of US copper output. In addition to copper, Rosemont is expected to produce significant amounts of silver and molybdenum over its 21-year mine life.

The project is scheduled to come into production in 2014.

The company’s TSX-listed share price reacted positively to the granting of the permit on Thursday, and rose by 9.88% to trade at C$2.67 apiece.

Edited by Creamer Media Reporter

Comments

Showroom

AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.122 0.158s - 88pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: