https://www.miningweekly.com
Consulting|Engineering|Environment|Fabrication|Infrastructure|Mining|Modular|PROJECT|rail|Resources|Roads|Services|WSP|Contracting|Infrastructure|Operations
Consulting|Engineering|Environment|Fabrication|Infrastructure|Mining|Modular|PROJECT|rail|Resources|Roads|Services|WSP|Contracting|Infrastructure|Operations
consulting-company|engineering|environment|fabrication|infrastructure|mining|modular|project|rail|resources|roads|services|wsp|contracting|infrastructure|operations

Ardmore phosphate rock project, Australia

2nd November 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Ardmore phosphate rock project.

Location
Queensland, Australia.

Client
Centrex Metals.

Project Description
Ardmore has a maiden ore reserve of 10.1-million tonnes at 30.2% phosphorous pentoxide supporting a ten year life-of-mine (LoM).

A definitive feasibility study (DFS) has confirmed the project as a high-quality asset with a relatively low capital investment, low technical risk and the potential to provide strong returns.

The DFS is based on an 800 000-wet-tonnes-a-month phosphate concentrate processing facility with a ten-year LoM based on the maiden reserves.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an unleveraged nominal pretax net present value, at a 10% discount rate, of A$172-million and an internal rate of return of 40%, with a payback of four years.

Value
The project has preproduction capital costs of A$77-million.

Duration
First operations are scheduled to start in mid-2019, with full-scale production scheduled for 2021.

Latest Developments
Fabrication is already under way on a modular start-up processing plant to provide 30 000 wet tonnes of premium-grade, phosphate-rock concentrate, with ultralow cadmium for potential offtake customers in the local region by mid-2019.

The start-up plant is readily upgradeable to full-scale operations and represents a major step in technically and commercially derisking the project.

Key Contracts and Suppliers
RPM Global (mineral resources); Optima Consulting & Contracting (ore reserves and mining); GR Engineering Services (process and mine site infrastructure, overall study compilation); WSP (roads and rail siding infrastructure); Integer Research (market review and pricing); and Golder Associates (environment, hydrology and hydrogeology).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Centex Metals, tel +61 8 8213 3100 or fax +61 8 8231 4014.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
14th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.262 0.334s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: