https://www.miningweekly.com
Eskom|Mining|Platinum|Service|Maintenance|Operations
Eskom|Mining|Platinum|Service|Maintenance|Operations
eskom|mining|platinum|service|maintenance|operations

Anglo Platinum's half-year earnings expected to be sharply down

Tunnel at Anglo American Platinum’s Mogalakwena mine.

Tunnel at Anglo American Platinum’s Mogalakwena mine.

17th July 2023

By: Martin Creamer

Creamer Media Editor

     

Font size: - +

JOHANNESBURG (miningweekly.com) – The earnings of Anglo American Platinum (Amplats) for the first half of this year are expected to be sharply down.

Headline earnings and headline earnings per share (HEPS) are likely to decrease by between 65% and 75%. Compared with R26.7-billion in the first half of last year, headline earnings are likely to be between R6.7-billion and R9.4-billion, the company informed the Johannesburg Stock Exchange News Service (SENS) on Monday.

HEPS are expected to decrease to between 2 544c and 3 569c a share compared with 10 140c in the first six months of last year.

Basic earnings per share for the period are likely to decrease by between 65% and 75% compared with the first half of last year, with basic earnings at between R6.6-billion and R9.3-billion, compared with R26.7-billion in the corresponding period of last year.

Compared with 10 125c in the first half of last year, earnings per share are expected at between 2 506c a share and 3 531c a share.

Earnings have decreased for the period largely owing to a decline in revenue as a result of the lower average platinum group metals (PGMs) basket price.

The main contributors to this were declines in the dollar prices of rhodium and palladium. Rhodium was down 47% and palladium 29% lower.

The weakening rand/dollar exchange rate partially mitigated the dollar price impact on the overall rand basket price, which decreased by 15% against the corresponding period last year.

Furthermore, sales volumes from own production, excluding trading, were 12% lower, reflecting lower refined production as a result of the Polokwane smelter needing post-rebuild ramp-up in January.

Also lowering sales volumes from own production were yearly maintenance and asset integrity work at the processing operations, along with the impact of Eskom load-curtailment, which resulted in deferred production of  66 400 oz of PGMs.

Continued inflationary pressure and exchange rate volatility have also led to higher mining and processing costs.

Costs incurred in purchasing of concentrate decreased compared with the first six months of last year owing to lower prices and volumes.

Amplats will release results for the six months ended June 30 on SENS on Monday, July 24, the company stated in a release to Mining Weekly.

Edited by Creamer Media Reporter

Comments

 

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.125 0.161s - 109pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: