Name of the Project
Amandelbult Mine Complex.

Location
Thabazimbi, in Limpopo, South Africa.

Project Owner/s
Anglo American Platinum (Amplat).

Project Description
Amandelbult mine will comprise three main areas – the modernisation of the existing mining areas that have started to deliver safety and efficiency; the start of the Middellaagte mine through the opencast operation, which will ramp up production to a maximum expected rate of between 110 000 t and 180 000 t a month; and mining studies to shape the future of Middellaagte and Tumela 1 subshaft.

Middellaagte is a replacement ounces project in prefeasibility study (PFS) ‘A’ phase. The project comprises declines from surface and underground development in the mine’s 15 East area. The study is focused on finding a suitable mechanised solution for the area, with a hybrid method (mechanised development with modernised stoping) being used as the base case.

Tumela 1 subshaft, also a replacement ounces project, is in PFS for the replacement of Tumela Upper. The study aims to maintain current Tumela production of 270 000 t a month, and conventional and mechanised options are being considered.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Amplat expects to start production at Middellaagte with an opencast mine at the end of 2023.

Latest Developments
At Middellaagte, agreements to acquire the adjacent mining right and surface lease access have been secured, allowing for this resource to be mined from surface.

At Tumela 1 subshaft, early access development has been approved and is in execution.

Key Contracts and Suppliers
None stated.

Contact Details for Project Information
Anglo American Platinum, Nevashnee Naicker, tel +27 11 638 3189 or email nevashnee.naicker@angloamerican.com.

 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Yale Lifting Solutions
Yale Lifting Solutions

Yale Lifting Solutions is a leading supplier of lifting and material handling equipment in Southern Africa. Yale offers a wide range of quality...

VISIT SHOWROOM 
Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.147 0.202s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: