https://www.miningweekly.com

Agbaja PFS delivers $497m price tag, 5Mt/y output – Kogi Iron

Agbaja PFS delivers $497m price tag, 5Mt/y output – Kogi Iron

Photo by Bloomberg

29th January 2014

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – The preliminary feasibility study (PFS) for iron-ore developer Kogi Iron’s Agbaja project, in Nigeria, has placed a $497-million price tag on the development of a five-million-tonne-a-year iron-ore project.

The project would have an internal rate of return of 23.7% and a pre-tax net present value of $420-million.

MD Iggy Tan said on Wednesday that the positive results from the study determined that the development and operation of a mine and processing plant at Agbaja were technically feasible, economically viable and socially and environmentally acceptable.

“Operating costs are estimated at around $43/t free-on-board and capital intensity at around $99/t. This places both the projected operating costs and the projected capital costs for Agbaja in the bottom half and bottom quartile respectively for global magnetite projects and [make it] comparable to some direct shipping ore hematite iron-ore projects.”

Tan noted that this was owing to the softness of the Agbaja material and the resultant moderate grinding intensity and simple processing plant design, the low strip ratio, gas-fired power and river barging for concentrate transport.

The project would have an estimated mine life of 21 years, with ore sourced from two mining areas. The Stage 1 area contains about 158-million tonnes of indicated mineral resource, which would sustain the operation for its initial 15 years.

The Stage 2 mining area contains about 66-million tonnes of indicated mineral resource, and would sustain the operation for a further six years.

“These strong results have led to approval from the board to proceed to a definitive feasibility study (DFS) as precursor to a decision to mine at Agbaja. The DFS is expected to be completed by the end of the fourth quarter, 2014.”

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.26 0.296s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: