Agbaja PFS delivers $497m price tag, 5Mt/y output – Kogi Iron
PERTH (miningweekly.com) – The preliminary feasibility study (PFS) for iron-ore developer Kogi Iron’s Agbaja project, in Nigeria, has placed a $497-million price tag on the development of a five-million-tonne-a-year iron-ore project.
The project would have an internal rate of return of 23.7% and a pre-tax net present value of $420-million.
MD Iggy Tan said on Wednesday that the positive results from the study determined that the development and operation of a mine and processing plant at Agbaja were technically feasible, economically viable and socially and environmentally acceptable.
“Operating costs are estimated at around $43/t free-on-board and capital intensity at around $99/t. This places both the projected operating costs and the projected capital costs for Agbaja in the bottom half and bottom quartile respectively for global magnetite projects and [make it] comparable to some direct shipping ore hematite iron-ore projects.”
Tan noted that this was owing to the softness of the Agbaja material and the resultant moderate grinding intensity and simple processing plant design, the low strip ratio, gas-fired power and river barging for concentrate transport.
The project would have an estimated mine life of 21 years, with ore sourced from two mining areas. The Stage 1 area contains about 158-million tonnes of indicated mineral resource, which would sustain the operation for its initial 15 years.
The Stage 2 mining area contains about 66-million tonnes of indicated mineral resource, and would sustain the operation for a further six years.
“These strong results have led to approval from the board to proceed to a definitive feasibility study (DFS) as precursor to a decision to mine at Agbaja. The DFS is expected to be completed by the end of the fourth quarter, 2014.”
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation