Lift II copper project, South Africa – update

11th August 2023 By: Sheila Barradas - Creamer Media Research Coordinator & Senior Deputy Editor

Lift II copper project, South Africa – update

Name of the Project
Lift II copper project.

Location
Limpopo, South Africa.

Project Owner/s
Palabora Copper, a subsidiary of the Palabora Mining Company.

Project Description
Palabora Copper has been producing copper in South Africa for more than 50 years, initially as a large opencast operation and thereafter as an underground block cave operation in 2002, known as Lift I.

The Lift II project scope includes:

The surface works scope includes:

Lift II will have a design capacity of 33 500 t/d, 380 m below Lift I, with a mine life to 2033.

Capital Expenditure
The project is estimated at R9.3-billion.

Planned Start/End Date
Not stated.

Latest Developments
Murray & Roberts Cementation achieved a milestone at the end of July when it successfully reached the 1 000 m mark on its contract to sink the 1 200 m ventilation shaft at the Lift II expansion.

Key Contracts, Suppliers and Consultants
Murray & Roberts Cementation (shaft sinking).

Contact Details for Project Information
Palabora Copper, tel +2715 780 2911.