Commercial production for Thor in Nigeria

5th October 2021 By: Creamer Media Reporter

TSX-V-listed Thor Exploration has declared commercial production at its Segilola gold mine, in Nigeria, with the processing plant now operating at its design throughput capacity of 715 000 t/y.

At full capacity, the plant will produce 85 000 oz/y of gold at a planned all-in sustaining cost of $685/oz.

The mine poured its first gold in July.