Chvaletice manganese project, Czechia – update

20th January 2023 By: Sheila Barradas - Creamer Media Research Coordinator & Senior Deputy Editor

Chvaletice manganese project, Czechia – update

Name of the Project
Chvaletice manganese project (CMP).

Location
About 90 km east of Prague, in Czechia.

Project Owner/s
Euro Manganese.

Project Description
A feasibility study on the project, published in July 2022, has determined that the CMP is uniquely positioned to provide a secure, traceable and responsibly produced supply of high-purity manganese products to the European electric-vehicle market.

The study is based on the reprocessing of historic tailings without the requirement of any hard-rock mining, crushing or milling.

The feasibility study envisages a 25-year operation producing 1.19-million tonnes of high-purity electrolytic manganese metal, about two-thirds of which is expected to be converted into high-purity manganese sulphate monohydrate on site.

Saleable product includes 2.5-million tonnes of high-purity manganese sulphate monohydrate, or HPMSM (32.34% manganese), and 372 300 t of high-purity electrolytic manganese metal (99.9% manganese) over the life of the project, averaging 98 600 t/y of HPMSM and 14 890 t/y of high-purity electrolytic manganese metal.

New and refurbished infrastructure that will be built to service the project includes:


Potential Job Creation
The project expects to employ about 400 people during operation.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $1.75-billion and an internal rate of return of 24/9%, with a 3.6-year payback.

Capital Expenditure
Initial capital is estimated at $757.3-million, including contingencies of $103.2-million.

Planned Start/End Date
Plant commissioning is expected to start in 2026, with production expected to start in 2027.

Latest Developments
Euro Manganese has signed an offtake termsheet with electric vehicle battery manufacturer Verkor for the sale of HPMSM from its Chvaletice manganese project, in the Czech Republic.

The offtake tonnage will be equivalent to a percentage of yearly HPMSM production on a take-or-pay basis. First deliveries are targeted for 2027 and span over an initial eight-year term, with the potential for renewal.

Pricing will be based on an index-adjusted western benchmark price, and will rise and fall proportionally with the movement of a published HPMSM index on a rolling three-month quotational period.

Key Contracts, Suppliers and Consultants
Tetra Tech (feasibility study) – tel +1 626 351 4664; BGRIMM Technology Group (lead process plant design engineer) – tel +86 10 6329 9888 or email DIB@bgrimm.com; Tractebel (Czech and European cost inputs, localisation); GET and Bilfinger Tebodin Czech Republic (environmental services) – tel +49 621 459 2377; and Sudop (railway infrastructure design) – tel +420 267 094 301 or email group@sudop-group.cz.

Contact Details for Project Information
Euro Manganese, tel +1 604 681 1010 or email info@mn25.ca.