https://www.miningweekly.com

Vital readies for start at Nechalacho

8th March 2021

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Vital Metals has produced a 12 kg rare earth carbonate bulk sample at its Nechalacho project, in Canada, as it prepares for the start of rare earth production in the second quarter.

The company on Monday said that the sample is now being prepared for shipment to offtake partner REEtec AS in Norway.

“Production of our bulk sample for REEtec is another important step towards reaching full production at Nechalacho. Production of this sample demonstrates we have our processes working correctly and we are preparing to send the sample to REEtec so it can undergo customer acceptance, as well as producing samples for other potential customers,” said Vital MD Geoff Atkins.

“We are preparing for our ore sorter to arrive at Nechalacho while mining is also due to start within the next few weeks, so we are getting really close to achieving our production goal.”

Vital aims to produce a minimum of 5 000 t of contained rare earth oxide by 2025 at the Nechalacho project, and has signed an offtake agreement with REEtec for Stage 1 production with the supply of 1 000 t/y for an initial five-year period.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION