Vital raises cash to restart Canada rare-earths project
PERTH (miningweekly.com) – Rare earths developer Vital Metals has completed a A$43-million institutional placement to fund the construction, mining and operation of its Nechalancho project, in Canada.
The company on Friday reported that it had received firm commitments for the placement of some 661.5-million shares, at a price of 6.5c each from institutional, sophisticated and professional investors.
The shares will be issued under the company’s existing placement capacity.
“We are pleased to receive such strong support for this placement from several large North American institutional investors who have joined our register, as well as from existing shareholders locally and internationally,” said Vital MD Geoff Atkins.
“This support validates our strategy to produce rare earths for a globally diversified supply chain. As demand for critical minerals including rare earth continues to grow, our Canada-based project is positioned to supply customers in North America, Europe and Asia.”
Atkins said that the placement ensured that the Stage 1 operations at Nechalancho were fully funded.
“We are excited to complete this milestone to allow mining operations to commence as we transition to a rare earth producer next quarter.”
An independent study on the construction and operation of the Nechalancho project found that the ore sorting plant would require a capital investment of $3.7-million.
Vital aims to produce a minimum of 5 000 t of contained rare earth oxide by 2025 at the Nechalancho project, and has signed an offtake agreement with REEtec for Stage 1 production with the supply of 1 000 t/y for an initial five-year period.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation