https://www.miningweekly.com

Vale's fourth-quarter iron-ore output edges down

1st February 2023

By: Reuters

  

Font size: - +

SAO PAULO - Brazil's Vale, one of the world's largest mining companies, on Tuesday reported a fourth-quarter 1% fall in iron-ore production from a year earlier, while the sales volume of nickel soared

The company said it produced 80.85-million tonnes of iron-ore during the last three months of 2022, sending its annual output to 307.8-million tonnes, slightly below its 310-million tonne forecast.

Vale blamed seasonally higher rainfall levels in its mines in Brazil for missing its forecast, as well as slower licensing processes in its Northern System.

Sales volumes of iron ore, a key material for making steel, fell 0.7% in the quarter, but still came in 24.2% above the previous three months, the company said.

Vale's production of nickel fell 1.3% to 47 400 t in the quarter, after scheduled maintenance stoppages at plants in Canada. Its sales volumes, however, soared 30.2% to 58 200 t, as the company shifted pent-up stocks to fulfill supply contracts.

Last month, Vale predicted an 2023 nickel output below last year's levels while iron ore production should remain flat.

The metal is also a key material for the booming electric vehicle industry, where it is used in the cathode component of batteries. Vale has struck contracts to supply nickel to major auto makers including Tesla and General Motors.

Looking to capitalize on soaring demand for nickel and copper from the EV market, Vale has been seeking a partner to buy a minority stake in its base metals unit.

Earlier this month, it said it had received non-binding offers for the stake, but did not disclose any names.

Edited by Reuters

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION