https://www.miningweekly.com

Vale starts up first of four tailings filtration plants

17th March 2021

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Brazil major Vale has started operations at the tailings filtration plant of the Vargem Grande Complex, the first of four plants to be built in Minas Gerais at a cost of $2.3-billion.

The start-up will not only reduce dependence on dams, but will also allow an improvement in the average quality of Vale's product portfolio with the use of wet processing on the site.

In the filtration process, the existing water in the iron-ore tailings is minimised, allowing most of the material to be stacked in a solid state, thus reducing dependence on dams.

Vale will start up the first filtration plant in the Itabira complex later this year, followed by a second at the same complex next year. In 2022, the first at the Brucutu site will start operating.

The four tailings filtration plants will serve beneficiation plants that have a total capacity to process 64-million tonnes a year of iron-ore.

Vale says the start-up of tailings' filtration operations in Vargem Grande is another step in stabilising iron-ore production on the way to resume the 400-million-tonne-a-year production capacity by the end of 2022.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION