Vale says Q2 output rises 5.5% despite pandemic
Brazilian miner Vale said on Monday that its second-quarter iron-ore production totalled 67.6-million tonnes, up 5.5% from a year earlier and 13.4% higher than the first quarter, despite the impact of the novel coronavirus.
Vale said it was keeping its full-year outlook for iron ore fines production unchanged at 310-million to 330-million tonnes, but emphasised that the most probable scenario was for output to be at the lower end of that range.
The result comes soon after iron-ore prices surged to their highest level in almost a year last week, above $111 a ton, amid a shortage of world supply as China reopens its economy. China has been boosting imports for the key steel ingredient.
Vale's key northern Brazilian mine S11D reached a annualized "run-rate" of 91-million tonnes in June, likely to improve further in the second half, pushing annual production slightly above 85-million tonnes, it said.
Nevertheless, a negative impact on production from the coronavirus of 3.5-million tonnes offset much of the improvements in the north.
Vale has been trying to recover output since a tailings dam in the town of Brumadinho burst early last year, killing some 270 people and forcing many similar structures to be shut down.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation