https://www.miningweekly.com

Vale halts iron-ore operations due to heavy rains, maintains guidance

10th January 2022

By: Reuters

  

Font size: - +

SAO PAULO – Brazilian miner Vale said on Monday it has partially halted operations at its Southeastern and South iron-ore systems due to heavy rains that are affecting the state of Minas Gerais, but reiterated 2022 production guidance as the Northern system was not affected.

Vale said in a securities filing that train circulation at its Vitoria-Minas railway was partially interrupted following the rains, which led output to be halted at the Brucutu mine and the Mariana complex as it was unable to transport iron-ore from these ventures.

Both are located at Vale's Southeastern system - as well as the Itabira complex, which was not affected.

At the Southern system, Vale said all of its complexes had to halt production as key highways BR-040 and MG-030 were interdicted.

Despite the haltings, Vale added that the Northern System is still operating as planned, and it reiterated its 2022 iron ore production guidance at 320-million to 335-million tonnes.

"Vale is taking all measures needed to resume activities and keeping its focus on the safety of employees and communities," the company said. It did not provide a detailed timeframe for operations to be resumed.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION