https://www.miningweekly.com

US Forest Service withdraws environmental report for Rio's Arizona copper mine

1st March 2021

By: Reuters

  

Font size: - +

The US Forest Service on Monday blocked a land swap sought by Rio Tinto in Arizona for its proposed Resolution Copper mine, dealing a serious blow to the project and a major win to Native American tribes.

The agency reversed a decision made in the waning days of former President Donald Trump's administration. The move comes less than a week after Tom Vilsack was sworn in as secretary of the Department of Agriculture, which oversees the Forest Service.

In 2014, then-President Barack Obama signed a Pentagon funding bill that approved Rio Tinto's proposal to exchange land for another parcel near the copper deposit, with the caveat that the swap could not occur until an environmental report on the mine was published. The Trump administration published that report on January 15, clearing the way for the exchange within 60 days.

The Forest Service on Monday rescinded that publication and blocked the land swap.

The company and partner BHP Group have spent more than $1-billion on the project already, though they have yet to obtain permits or produce any copper, a metal used in electric vehicle batteries. If developed, it would supply a quarter of US copper demand and generate more than $280-million in annual taxes.

Rio Tinto said it was evaluating the Forest Service's decision. "In the meantime, we will continue to engage in the process determined by the US government and are committed to ongoing consultation with Native American tribes and local communities," said Rio spokesman Matt Klar.

BHP did not respond to requests for comment.

Arizona's San Carlos Apache Tribe has long objected to the mining project because it considers the land home to religious deities.

"This is the right move," said Terry Rambler, chairman of the San Carlos Apache. The environmental report "was being used to justify trading away our sacred land to further enrich wealthy foreign mining companies."

Edited by Reuters

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION