https://www.miningweekly.com

Triton sticks to plan at Ancuabe

1st December 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Triton Minerals has recommitted itself to the full-scale development of its Ancuabe graphite project, in Mozambique, as envisioned in a 2017 definitive feasibility study (DFS).

The company told shareholders on Thursday that the decision to move straight to a large-scale development was based on the strong and increasing demand for graphite from both the battery and industrial applications sector, and the potentially exceptional returns that could be generated.

The original DFS considered a one-million-tonne-a-year processing rate delivering about 60 000 t/y of graphite concentrate over a mine life of 27 years. The 2017 study estimated that the project would require a capital investment of $99.4-million, and based on a graphite price of $1 435/t, could generate earnings before interest, taxes, depreciation and amortisation of $1.17-billion.

Triton earlier this year completed a strategic review and desktop study on the Ancuabe project, considering various alternatives to bring the project into production in the short term, including a Stage 1 development of a commercial pilot plant producing 5 000 t/y to 8 000 t/y of graphite concentrate, which would later be expanded to the Stage 2 project targeting the 60 000 t/y production.

Triton told shareholders on Thursday that the company was now completing a revised project plan, starting with an update of the 2017 DFS, which would focus on updating the basket pricing, up-front capital expenditure, operating costs and sustaining capital expenditure.

Potential investor Shandong Yulong, as proposed cornerstone investor into Triton Minerals, is willing to provide the company with expertise in a number of disciplines, including engineering, mining technology and construction, marketing and finance.

Triton in September this year announced a A$5-million investment from the Chinese-listed commodities trader, under which it would subscribe for more than 178.5-million shares in Triton, at a price of 2.8c each, each with a free-attaching option and an expiry date of the end of December 2025, and an exercise price of 4c each.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION