https://www.miningweekly.com

TNG diversifies into lithium

16th August 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed TNG has acquired the Sandover lithium project, some 50 km from its Mount Peake vanadium/titanium/iron project, in the Northern Territory.

The two exploration tenements that make up the project area cover 8 151 km2 and are considered highly prospective for lithium in pegmatites.

The Sandover project was acquired from private Northern Territory-based prospectors on acquisition terms of A$25 000 per granted licence, with the consideration paid on transfer.

TNG told shareholders on Tuesday that the company has been completing due diligence on the licences since February 2022.

“We are very pleased to have secured this highly prospective area for shareholders, which represents an exciting and logical addition to our flagship Mount Peake deposit. The area represents, in all likelihood, one of the last areas that is prospective for lithium in the Northern Territory,” said MD and CEO Paul Burton.

“While we remain fully focused on developing the Mount Peake project, we want to continue to build up our growth portfolio in battery-related and future strategic metals. The global energy transformation and the move to electric vehicles will see a structural increase in the consumption of metals such as lithium and vanadium. We want to be positioned to take advantage of this surge in demand for both elements.”

TNG intends to explore for lithium-bearing pegmatites using traditional rock chip and soil sampling methods in areas with outcrop or residual soils. This will be augmented with state-of-the-art remote sensing exploration techniques in order to rapidly locate pegmatites at surface and beneath thin sand cover.

The land area is also considered highly prospective for both sediment-hosted copper and iron oxide/copper/gold deposits, following recent work by the Northern Territory Geological Survey.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION