https://www.miningweekly.com

Tertiary Minerals' MB fluorspar project approved for Phase 3 drilling

16th September 2014

By: Creamer Media Reporter

  

Font size: - +

JOHANNESBURG (miningweekly.com) – Aim-listed Tertiary Minerals on Tuesday said the permitting for Phase 3 drilling at the MB fluorspar project, in Nevada, had been approved.

The Phase-3 drilling programme was planned to increase the size of the inferred mineral resource by extending the drilling to the north and west of the defined mineral resource, as well as target potential higher-grade fluorspar closer to the source of mineralisation by drilling to the west of the defined mineral resource.

The fluorspar-focused mineral exploration and development company explained that the programme had been approved under a notice to conduct exploration drilling by the US Bureau of Land Management (BLM) and a reclamation bond was lodged and accepted by the BLM.

The drilling contract had been awarded to Boart Longyear, with drilling expected to be completed by the end of November. This would be followed by analytical results, which would be reported periodically as they became available, starting in the fourth quarter of 2014.

Tertiary Minerals MD Richard Clemmey said: “We are delighted to have completed the planning and have all the necessary approvals in place to start our Phase-3 drilling programme on the MB project. This is an exciting phase where we expect to increase the size of the already significant Joint Ores Reserves Committee- (Jorc-) compliant mineral resource and target potential higher-grade fluorspar.”

On April 16, the company announced a substantial maiden Jorc-compliant mineral resource estimate for the MB fluorspar project of 38.4-million tonnes, grading 10.4% fluorspar at 8% fluorspar cutoff.

The deposit remains open at depth and in all lateral directions.

Edited by Tracy Hancock
Creamer Media Contributing Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION