https://www.miningweekly.com

Strike secures an additional A$20m for Perth Basin

23rd June 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Strike Energy has secured up to A$20-million in additional funding through a secured debt facility with Macquarie Bank to fund pre-development and development costs for its Perth Basin gas projects.

The facility is structured in two tranches, with the first tranche of A$10-million committed with similar conditions to the existing drawn debt, while the second tranche of A$10-million is uncommitted and subject to Macquarie’s approval.

The first tranche funding would cover current operational activities, while the second tranche is intended to progress the development of the Perth Basin assets, subject to Macquarie approval.

As part of the establishment cost of this new facility, Strike will issue Macquarie with 20.7-million options to subscribe for Strike ordinary shares at an exercise price of 34c. The options will be issued at the financial close of the initial tranche, will not be subject to shareholder approval, and will expire in December 2024.

Strike’s Project Haber has been corporately structured so as to quarantine the fertiliser plant, the South Erregulla gas fields, sequestration reservoir and the recently acquired land that forms the Mid West Low Carbon Manufacturing Precinct.

Strike and its advisers are investigating potential options for pre-final investment decision (pre-FID) capital expenditure to be funded from within this structure which may include possible non-parent recourse pre-development facilities or a potential initial sell-down of a minority interest at the project level. In the medium term, a further project equity sell-down prior to FID is the primary mechanism that Strike intends to use to fund its equity contribution to construction.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION