https://www.miningweekly.com

Strike continues at BHP copper mines in Chile

1st June 2021

By: Reuters

  

Font size: - +

SANTIAGO – A strike by workers for BHP's Escondida and Spence copper mines in Chile entered its fifth day on Monday, as the union awaited a decision by labor authorities over whether substitute workers the company called in are legal, a union leader told Reuters.

The 200-member union, which runs BHP's Integrated Operations Center in Santiago, walked off the job last Thursday. Global miner BHP subsequently called in substitute workers keep the mine running, a move the union said violated their right to an effective strike.

"We are waiting for the audits in the DT (Labor Directorate) to address the issue of replacements," said Jessica Orellana, president of the guild. She told Reuters that there had been no move to return to talks with BHP.

Workers for the union are considered contractors by BHP, which has raised questions about whether substitute workers can be hired to replace them during a strike. Chilean labor law in some cases forbids such replacements.

BHP told Reuters in a brief statement that both Spence and Escondida "have adopted contingency plans to maintain its operations, always fully respecting the legal framework governing collective bargaining."

The strike at Escondida, the world's largest copper mine, and at the smaller Spence comes as copper prices have spiked amid soaring demand as the world's largest economies revive following more than a year of coronavirus-induced stagnation. The rising prices have given additional leverage to organised labor at Chile's sprawling copper mines.

Since the start of the strike, BHP has not reported on the status of production at either of its operations.

The remote operations workers have held small protests in Santiago since walking off the job.

A separate union of workers at the Spence mine also rejected a contract offer by BHP late last week, and will enter a final round of government-mediated talks in a bid to stave off its own strike, union president Ronald Salcedo told Reuters.

The much larger union of on-site workers at Escondida is also set to begin collective bargaining for a new contract in the coming weeks, and have warned they are bracing for a prolonged strike.

Edited by Reuters

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION