https://www.miningweekly.com

Accommodation supplier expands Botswana footprint

29th March 2019

By: Mc'Kyla Nortje

Journalist

     

Font size: - +

Since establishing a footprint in Botswana in 1991 to cater to the site accommodation needs of mines, modular building supplier Speedspace Botswana has expanded its operations by opening a new satellite branch in Letlhakane, in northern Botswana.

Operations at the new branch, which Speedspace Botswana country manager Kyle Wasserfall says is “ideally situated within 15 km to 20 km of four diamond mines”, started earlier this month.

He tells Mining Weekly that three employees will man the new branch. This is in response to the planned expansion of the Cut 3 project of mining company Debswana’s Orapa diamond mine, which will require more staff on site, as well as the continued growth of Lucara Diamond Corporation’s Karowe diamond mine, and the renewal and expansion of mining company Cupric Canyon subsidiary Khoemacau Copper Mining’s mine near Maun.

“This move will also enable us to strategically service Botswana from Ghanzi, Maun and Kasane in the north; Francistown and Pikwe in the east, and Palapye to the south,” notes Wasserfall.

The company deals with the Debswana Jwaneng, Orapa, Damtshaa, Letlhakane and Karowe diamond mines, as well as the Khoemacau copper mine, coal development firm Minergy’s Masama coal mine and the Botswana ash salt mine in Botswana.

He adds that being based in the area makes maintenance more cost effective for its clients and for the company as well. “Not only is it cost saving but also time saving – previously, we would need to allow for two days of transport to and from site.”

Wasserfall concludes that having stock, such as rental units and material to build prefabricated housing, immediately available in Letlhakane will reduce lead times for clients, while the cost of transporting rental units will be reduced by up to 70%, compared with delivery from Speedspace’s head office, in Gaborone.

Edited by Mia Breytenbach
Creamer Media Deputy Editor: Features

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION