South32 warns of coal impairment, looks at options for Dendrobium
PERTH (miningweekly.com) – Diversified miner South32 has warned of a $728-million pretax impairment charge for its Illawarra metallurgical coal operations for the 2021 financial year, following a review of the asset’s carrying value.
The miner told shareholders that the impairment charge reflected the increased approval uncertainty created by the New South Wales Independent Planning Commission’s (IPC's) decision to refuse the application for the Dendrobium Next Domain life extension project, and the resultant potential impacts on the economics of the broader Illawarra complex.
The IPC in February pushed back on the development of the A$956-million extension project that would see an additional 78-million tonnes of run-of-mine coal recovered from two new areas, Areas 5 and 6, comprising 21 long wall panels, and would extend the mine life until the end of 2048.
Coal production from Area 5 was initially anticipated to start in 2024, with Area 6 production to follow some 19 years later.
In its finding, the Commission stated that the proposed longwall mine design introduced uncertainty regarding the extent of environmental impacts and South32’s ability to manage those, saying that the project was likely to lead to potentially significant surface water losses into the groundwater system.
The findings also questioned the adequacy of South32’s proposed offset and compensatory provisions for impacts on water quantity and quality in the catchment, as well as stating that the predicted Scope 1, 2 and 3 greenhouse-gas emissions from the project would be "significant".
South32 on Wednesday said that it has scaled back activities on the Dendrobium Next Domain project while the company was considering options following the IPC decision. These options include starting proceedings in the Land and Environment Court of New South Wales for a judicial review of the decision, and the potential submission of an alternate mine plan to the New South Wales Minister for Planning and Public Spaces for determination of the project as State Significant Infrastructure.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation