https://www.miningweekly.com

South Africa's entire coal line to be shut for maintenance – Transnet

28th June 2019

By: Reuters

  

Font size: - +

CAPE TOWN – South Africa will shut down its entire rail network transporting coal from pits to customers for almost two weeks to undertake scheduled repairs, State-owned freight rail logistics firm Transnet said on Friday.

Transnet Freight Rail said the shutdown, from July 2 to 11, would cover the entire coal line which has flows originating from Ermelo, Vryheid, Richards Bay, Witbank, Ladysmith and Isando.

To watch Creamer Media's latest video reports, click here
 

Edited by Reuters

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION