https://www.miningweekly.com

Shaky iron market turns to Vale for final piece of supply puzzle

2nd February 2021

By: Bloomberg

  

Font size: - +

With iron-ore at a crossroads, investors turn to Brazilian producer Vale for the final piece of the supply puzzle.

Last month, BHP Group boosted its forecast for annual production, while Rio Tinto Group is also seeking to lift shipments of the steel-making ingredient this year. Vale -- the other member of the trio of suppliers that dominate the seaborne market -- will deliver its production report on Wednesday, including updating annual guidance.

Stronger-than-expected fourth-quarter output or an increase in 2021 projections at Vale could pour more cold water on iron ore prices that have recoiled on China’s push to rein in steelmaking amid slumping margins and rising port stockpiles.

Futures, which surged to as high as $175 a metric ton in December, have slipped back to about $150 and could end the year at $100, according to Daniel Hynes, senior commodity strategist at Australia & New Zealand Banking Group Ltd.

Still, there’s also a stronger-for-longer case, with Morgan Stanley this week outlining the “plausible scenario” of $165-plus over the next three years. A disappointing report from the world’s second-largest supplier would support such a storyline. While Chinese demand may slow, it remains robust.

The Rio de Janeiro-based company will report quarterly output of 86.6-million tons, according to the average estimate of seven analysts surveyed by Bloomberg. That would be a slight decline from the third quarter but well ahead of the same period a year earlier.

Assuming there were no big surprises in the final three months of the year, attention will focus on guidance. In its previous report, Vale lowered its 2020 iron ore projection to between 300-million and 305-million tons and forecast 315-million to 335-million tons this year. At the time, executives described the 2021 goal as part of a conservative approach, leaving the door open to adjustments. Since then, operations resumed at its Samarco venture with BHP.

Vale is still looking to return to a capacity of 400-million tons, which would see it regain the title of world’s biggest producer that it lost to Rio Tinto in the wake of the Brumadinho dam collapse that killed 270 people.

But the production recovery is taking a little longer than thought as Vale navigates legal and pandemic obstacles. That helped fuel last year’s price rally that pushed up earnings. The company was raised to an investment-grade credit rating by Moody’s and has reinstated dividend payments.

Edited by Bloomberg

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION