https://www.miningweekly.com

Savannah moves closer to Portugal lithium mine with preliminary impact study approval

19th April 2021

By: Reuters

  

Font size: - +

LISBON - Savannah Resources said a "major milestone" had been passed for what could become western Europe's largest lithium mine, after Portugal's regulator gave its environmental impact study a preliminary stamp of approval.

Interest in lithium mining has been spurred by the expected growth in sales of electric vehicles, which are cheaper to run and more environmentally friendly than other cars.

However, lithium projects in Portugal face strong opposition from environmentalists and local communities, who are demanding stronger regulation and more transparency.

Portugal is Europe's biggest lithium producer, but its miners sell almost exclusively to the ceramics industry and are only now preparing to produce the higher-grade lithium that is used in electric cars and to power electronic appliances.

Barroso, declared a world heritage site for agriculture in 2018, is one of many lithium-rich areas in northern Portugal and London-based Savannah already mines feldspar, quartz and pegmatites in the mountainous region.

Savannah expects the Barroso mine to "provide Europe with a strategically important local, long term and secure source of lithium raw materials," its chief executive David Archer said.

Portugal's environment regulator APA said that the company's environmental impact assessment confirmed with its requirements, Savannah added in a statement on Friday.

It will now progress to the next stages of the process, including a public consultation, which will then be evaluated by APA before final approval, Savannah said.

Archer said lithium was added to the European Commission's list of critical raw materials last year.

This was to reflect its importance to, among other things, tackle the "threat to raw material supply availability to the EU due to increased demand globally," he added.

Savannah said the project, which could contribute more than 1.2-billion euros ($1.44 billion) to Portuguese GDP, would comply with all the environmental requirements, from water usage to reducing its light and sound impact.

Edited by Reuters

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION