San Jose study shows robust project at 'half current lithium price' – Plymouth
PERTH (miningweekly.com) – A scoping study has found that the San Jose lithium/tin project, in Spain, could deliver 15 000 t/y of battery grade lithium carbonate over an initial mine life of 24 years.
ASX-listed Plymouth Minerals on Wednesday reported that the project was expected to require a capital investment of $273-million, with life-of-mine (LoM) C1 cash costs estimated at $5 004/t, without credits.
The San Jose project could generate LoM revenues of up to $2.7-billion, and has a net present value of $401-million and an internal rate of return of 28%.
The battery grade lithium carbonate would be produced at about "half the current lithium price", Plymouth MD Adrian Byass said. The study assumed a life-of-mine sales price of $10 000/t, based on an assessment of price trends and market commentary. The current spot pricing in Europe for +99.5% lithium carbonate is trading between $16 000/t and $20 000/t.
“The scoping study demonstrates that the San Jose lithium/tin project has significant production scale, long mine life, high margins and further upside yet to be factored in through the potential to generate by-product credits, which would further enhance the already very attractive economics at conservative sales price assumptions,” said Byass.
He noted that the company had identified a number of potential upside opportunities for the project, which would allow for the optimisation of economic returns and positioned the company well to be a significant player in the European lithium market.
“Plymouth will now accelerate additional optimisation studies required before moving to a feasibility study over the coming months as outlined in the agreement with our project partner Sacyr.”
Under the terms of the agreement, now that Plymouth has acquired a 50% stake in the project, the company will elect to complete the feasibility study by spending a minimum of €2.5-million to earn a 75% interest in the San Jose project.
The feasibility study is being targeted for completion in the first half of 2018.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation