https://www.miningweekly.com

Samarco to resume $4bn debt restructuring talks - sources

5th November 2019

By: Reuters

  

Font size: - +

SAO PAULO – A Brazilian mining joint venture between Vale and BHP Group, paralysed after a fatal dam collapse, is expected to resume talks to restructure $4-billion in defaulted debt in coming weeks, two sources with knowledge of the matter said.

The venture, Samarco Mineracao, last month won permission to resume operations at its Germano iron-ore mine, four years after a dam burst in the city of Mariana, in Minas Gerais state, that killed 19 people and contaminated rivers.

The license granted in late October clears the way for production to resume in the second half of 2020, but at a fraction of its output before the accident, meaning limited potential revenue to service debt, at least initially.

Although restructuring talks had not been formally interrupted, they were paused over the last two years as the company negotiated a timeframe to resume operations with prosecutors.

Vale is being advised in the talks by Moelis & Co, BHP Plc by Rothschild, and Samarco by JPMorgan Chase & Co , according to the sources.

Vale and Samarco declined to comment. BHP did not immediately reply to requests for comment.

An agreement with creditors on the debt restructuring, which is expected to address the pace of payments as well as any reduction in principal, could take months, the sources added.

Resumption of operations at the mine depends on Samarco's planned adoption of mining waste disposal techniques that avoid the use of tailings dams similar to those which collapsed near Mariana and - earlier this year in a similar fatal disaster - the town of Brumadinho.

Production could resume at 8 million tonnes of iron ore a year, with Samarco not returning to its pre-collapse level output of 25 million tonnes for a decade, the company has said.

Edited by Reuters

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION