Rio Tinto to build 34 MW solar plant at Pilbara mine
Diversified mining company Rio Tinto is investing in its first company-owned solar facility, with about 100 000 solar panels set to supply electricity to its new Koodaideri mine in Australia’s Pilbara.
The company is investing $98-million in a 34 MW solar photovoltaic (PV) plant, which is complemented by a 12 MWh battery energy storage system in Tom Price to help power its entire Pilbara power network.
The PV plant is expected to supply all Koodaideri’s electricity demand during peak solar power generation times and about 65% of the mine’s average electricity demand.
Construction is expected to begin later this year, subject to government approvals, and is due to be completed in 2021.
The $2.6-billion Koodaideri mine was approved in November last year with construction starting earlier this year. Production capacity will be 43-million tonnes a year with first production expected to start by the end of 2021.
The Koodaideri solar plant and battery are estimated to lower yearly carbon dioxide emissions by about 90 000 t, compared with conventional gas-powered generation.
“We are investigating additional renewable energy options in the Pilbara, as well as other opportunities to reduce emissions across our entire global portfolio, building on the 43% reduction in absolute greenhouse gas emissions since 2008,” said Rio Tinto Iron Ore CEO Chris Salisbury.
Funding for the solar plant and battery sits within Rio Tinto’s existing guidance for sustaining capital expenditure for its iron-ore business.
Rio Tinto's Weipa operation in Queensland already sources power from an on-site solar facility.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation