https://www.miningweekly.com

Rio produces new critical mineral in Utah

12th May 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Diversified miner Rio Tinto has started tellurium production at its Kennecott copper operation in Utah, becoming one of only two US producers of the critical mineral used in advanced thin film photovoltaic solar panels.

The tellurium will be refined in North America by 5N Plus, a global producer of specialty semiconductors and performance materials, under a commercial agreement between 5N Plus and Rio Tinto.

The refined tellurium will primarily be supplied to First Solar, the only American company among the world’s ten biggest solar manufacturers, under an existing supply contract between 5N Plus and First Solar. 5N Plus will also use the tellurium to manufacture ultra-high purity semiconductor materials at its facility in St. George, Utah, to serve the security and medical imaging markets.

Rio said this week that some 20 t/y of tellurium will be produced through a new $2.9-million circuit built at the Kennecott refinery. This material is recovered from by-product streams generated during the copper refining process, reducing the amount of waste that needs to be treated and discarded as mine tailings.

Tellurium is listed as a critical mineral by the US government, owing to its importance to the economy and energy security, and is one of ten metals and products recovered from ore extracted at Kennecott, which produces nearly 15% of US copper with the country’s lowest carbon footprint.

“We are proud to deliver a new domestic supply of tellurium to support the manufacturing of solar panels and other critical equipment here in the US. Approximately 90% of the world’s tellurium resource is contained in copper ore and no other metal has more critical mineral by-products than copper,” said Rio’s copper COO, Clayton Walker.

“The Kennecott team is constantly looking for ways to extract new critical minerals to meet emerging demand for the clean energy transition.”

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION