https://www.miningweekly.com

Resolute beats upgraded guidance, earmarks A$162m for FY18 growth projects

12th July 2017

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Gold miner Resolute Mining produced 329 834 oz of gold in the year ended June, exceeding both its original and upgraded guidance of 300 000 oz and 325 000 oz, respectively.

All-in sustaining costs (AISC) for the year of A$1 130/oz were also better than the original cost guidance of A$1 280/oz and the revised guidance of A$1 150/oz.

Outstanding results from the Syama mine, in Mali, and from the Ravenswood operation, in Queensland, helped the production and costs performance, the company reported on Wednesday.

“During 2017, Resolute continued to generate strong free cash flow during a period of transition at both of our operating mines. Production and cost outperformance have been matched with maximised revenues from bullion sales,” said MD and CEO John Welborn.

Gold sales for the full year reached 317 242 oz, with average gold prices reported at A$1 717/oz.

“The exceptional 2017 operating and financial performance places the company in a robust position to deliver on our exciting project pipeline at Syama, Ravenswood and Bibiani [in Ghana]. Given the scale of our planned capital investment in 2018, we will need to continue to demonstrate industry-leading discipline as we transform the company and deliver new long-life mines which will generate exceptional returns for shareholders.”

Looking ahead to 2018, Resolute expects gold production to be 300 000 oz, at an AISC of A$1 280/oz.

Resolute expects to spend about A$162-million on growth projects at Syama underground and at the Ravenswood expansion project.

The Syama project is expected to deliver some 220 000 oz of gold in 2018, of which 90 000 oz will be generated from oxide operations and a further 130 000 oz from the sulphide operations.

Production levels at Ravenswood will temporarily reduce as the Mt Wright underground mine is completed, and the Ravenswood operation transitions to openpit mine.

For 2018, Ravenswood is expected to deliver 89 999 oz of gold, with gold to be generated from the underground operation, as well as the Nolans East openpit mine, and from existing openpit stockpiles.

The Mt Wright underground mine is expected to cease operations in the final quarter of the 2018 financial year, while Nolans East openpit mining will be completed by the end of 2017.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION