https://www.miningweekly.com

Provaris to incorporate govt findings in own FS

31st January 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Provaris Energy on Tuesday said it would incorporate the findings from the Western Australian government’s Compressed Hydrogen Export Feasibility Study Public Sharing Reporting into its feasibility study (FS) for its HyEnergy project.

The study, which received funding from the state government’s Renewable Energy Fund, analysed the compression and export of 200 000 t/y of green hydrogen from the proposed HyEnergy hydrogen production facility in the Gascoyne region, and includes compression facilities, an outgoing pipeline to an offshore loading terminal, a fleet of Provaris’ proprietary H2Neo 26 000 m3 GH2 Carriers, and an import terminal in Singapore.

The government study estimated that the onshore compression facilities could create some 615 full-time jobs over a 34-month execution plan, while the operation of the onshore compression facilities would support 14 full-time jobs, excluding any additional indirect employment opportunities.

Modelling estimated that the project would require a capital investment of $2.5-billion, but noted that further design, development and optimsations are expected to reduce the capital and levelized cost of the hydrogen.

“We thank the Western Australian government for their support and financial assistance through the Western Australian Hydrogen Fund. Compression is a proven, safe and reliable method of storing and transporting hydrogen onshore. Outcomes of this study continues to demonstrate a compressed hydrogen supply chain for marine storage and transport solution can accelerate the development of greenfield hydrogen export projects with the flexibility to also cater to offshore loading requirements and variable renewable energy production profiles,” said Provaris MD and CEO Martin Carolan.

“We look forward to the next stage of development for the HyEnergy project and incorporating the outcomes of this study into the project’s prefeasibility study.”

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION