https://www.miningweekly.com

Prospect’s Zim lithium pilot plant to start producing this month

7th June 2021

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

Lithium company Prospect Resources on Monday reported that it had completed 92% of the work on its engineering, procurement and construction scope for the high-purity petalite pilot plant on the outskirts of Harare, Zimbabwe.

Some of the milestones completed for the plant include flowsheet and detailed engineering, procurement of equipment, power supply connection and reticulation on site, ore stockpile prepared to feed crushing circuit, and earth- and civil works.

Prospect said that production and first shipment of petalite product would start by the end of June.

Zimbabwe President Emmerson Mnangagwa is expected to preside over a ceremony marking the start of production later this month.

Prospect MD Sam Hosack commented in a statement that the company was “shovel ready” to develop the Arcadia project, at a time when lithium prices are on the rise.

An updated definitive feasibility study envisages a 2.4-million-tonne-a-year conventional openpit mining operation, producing average concentrate of about 173 000 t/y of 6% spodumene, 24 000 t/y of chemical grade petalite and 98 000 t/y technical grade petalite at a concentrate grade of 4%, as well as 174 000 lb/y of tantalum at a concentrate grade of 25%.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION