https://www.miningweekly.com

Polyus completes $60m mill expansion

25th May 2021

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Russian miner Polyus has completed the $60-million expansion of the Verninskoye mill, allowing for an additional 40 000 oz of incremental gold volumes at the mine.

The upgrade has achieved target hourly throughput rate of 450 t/h and it is currently running at an annualised capacity of 3.5-million tonnes, the company said on Tuesday.

The project, launched in the fourth quarter of 2019, was completed ahead of its initial schedule and in line with its initial budget, Polyus said in a statement.

The miner has completed a number of initiatives to upgrade the crushing and grinding circuit at Verninskoye. This included the installation of an additional crushing circuit comprising a ball mill and two vibrating screens in the extension of the main building. An additional cone crusher and screens were installed to reduce recirculation and increase the throughput capacity of the existing semiautonomous and grinding mill. The gravity concentration circuit was equipped with additional centrifugal concentrators and a hydrocyclone unit, which were also installed in the main building extension.

As part of the project, Polyus implemented several initiatives aimed at improving recoveries, including the installation of an additional reactivation kiln in the main building extension, as well as installation of an additional centrifugal concentrator in the main building. This resulted in the recovery rate at Verninskoye reaching about 90% in February.

 

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION