https://www.miningweekly.com

Polymetal approves $431m POX-2 project

11th February 2019

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Russian gold miner Polymetal on Monday announced the approval of the POX-2 project and authorised the immediate start of construction, with the aim of commissioning the plant by the third quarter of 2023.

The company’s second pressure oxidisation facility is immediately adjacent to the current Amursk POX hub and will require an investment of $431-million, which will be funded from the London-listed miner’s operating cash flows.

Polyus is using pressure oxidation to process refractory ore, which currently comprises about 55% of its total reserves. The POX-2 will process 4.3-million tons of concentrates from the Kyzyl, Nezhda, Mayskoye and Voro mines, containing 9.3-million ounces of gold.

Polymetal stated that the POX-2 would result in the incremental production of about 30 000 oz/y to 35 000 oz/y from the same volumes of feedstock and, on average, would lower total cash costs by $100/oz to $150/oz for 500 000 oz/y of gold production.

The plant’s design capacity is 250 000 t/y to 300 000 t/y of concentrate, depending on the levels of sulphur content. Maximum sulphide sulphur processing capacity is 48 000 t/y. the Amurks POX facility has a capacity of 200 000 t/y and a 30 000 t/y sulphur capacity.

The POX-2 would also create capacity for treating third-party refractory concentrates, a market which had growth considerably in Russia and globally, in recent years.

Polymetal said that the POX-2 project had an internal rate of return of 14 and a net present value of $112-million.

In terms of the project development timeline, detailed engineering and construction would start in the second quarter of 2019, with first production pencilled in for the third quarter of 2023 and the plant ramping up to full production by the final quarter of that year.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION