https://www.miningweekly.com

Plymouth selects processing route for Spain project

17th August 2017

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Australia’s Plymouth Minerals and joint venture (JV) partner Valoriza Mineria have selected a commercial and known sulphate calcine/roast and fresh water leach processing route for the San Jose lithium/tin deposit, in Spain.

The selection of a processing route allows the JV partners to determine an estimation of operating costs, the largest component of which is the processing costs.

Integrating historical and recent testwork information, the processing cost has been estimated to be between $3 600/t and $4 400/t battery grade lithium carbonate (LC).

“This is an excellent result and broadly better than expectations based on public research and public, historic studies at San Jose,” Plymouth said on Thursday.

Sulphite calcine/roast mixes mined lithium-bearing material with a sulphate and then heats it to about 830 °C. Lithium is leached into solution using fresh water and the lithium-bearing liquor is then processing using evaporation, precipitation and purification to produce a refined battery-grade LC. In comparison, commercial production from spodumene concentrates requires heating to more than 1 100 °C and then baking in acid to 200 °C prior to leaching lithium into solution.

The San Jose deposit contains more than 1.3-million tonnes of LC. The JV partners are proposing to mine 1.25-million tonnes a year of ore to feed a beneficiation plant to produce 15 000 t/y of battery-grade LC on site.

The selection of a processing route forms part of the technical work required for the submission of a mining licence application (MLA) for San Jose. Plymouth said that the MLA would be lodged in early October.

Plymouth will earn its 50% interest in San Jose, assuming expenditure of at least €1.5-million, when the MLA is submitted.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION