https://www.miningweekly.com

PFS proves Langer Heinrich restart viable

14th October 2019

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – A prefeasibility study (PFS) into the restart of the Langer Heinrich uranium project, in Namibia, has confirmed that $80-million in capital will be required to support a 5.2-million-pound-a-year operation.

ASX-listed Paladin Energy on Monday said that there was an opportunity to increase production to 6.5-million pounds a year through additional high return, discretionary capital spend of $30-million, further enhancing access to offtake and financing.

“The Langer Heinrich mine is a world class uranium asset and this study confirms Paladin’s key position as a first mover back into production in a recovering uranium market,” said CEO Scott Sullivan.

The PFS estimated that all-in sustaining costs over the mine life would be around $30/lb with further cost improvements of around $4.50/lb achieved through significant process changes after a restart of operations.

“Achieving production of over five-million pounds at a cost of under $30/lb and with a 12-month lead time on execution, were key targets of the board and executive team, and will see Langer Heinrich in an enviable position when uranium prices recover,” said Sullivan.

“This study continues to demonstrate the high quality and potential of the asset and provides a solid foundation for a confident and successful restart.”

Paladin holds a 75% stake in the Langer Heinrich project, which was placed on care and maintenance in August of last year, following a fall in the uranium price.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION