https://www.miningweekly.com

‘Peak’ cobalt is not on the horizon – S&P’s Global Market Intelligence

16th July 2018

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

Peak cobalt is not on the horizon, says Standard & Poor’s (S&P’s) Global Market Intelligence metals and mining research analyst Michael Giblin.

In a report published on Monday, he noted that 2017 had shown small changes in global cobalt supply. Global mined cobalt production showed a slight drop last year to 115 071 t from 116 272 t in 2016.

The majority of cobalt supply is sourced from copper/cobalt operations in the Democratic Republic of Congo (DRC), with the bulk of the remainder being mined at nickel/cobalt operations across the world.

The reduction in supply in 2017 was driven in large part by the loss of production from Lubumbashi Slag Hill, resulting in an overall reduction in output from the DRC.

Supply risks are associated with the dominance of the DRC in cobalt supply and these risks must be managed as there is no region that can match output

from the DRC, Giblin says.

He points out that the DRC alone has sufficient reserves to produce cobalt at current levels for over 30 years.

“The DRC alone [holds] about 50% of both global reserves and resources. The remaining 50% of reserves and resources are geographically diverse, with no region in a position to replace production if supply is disrupted from the DRC,” he notes.

S&P’s Global Market Intelligence, meanwhile, expects some large cobalt projects to come on line soon.

“We expect mined cobalt supply to increase at a compound yearly growth rate of 12% to 2021 with the majority of the growth from formal mining operations in the DRC.”

Production from diversified miner Glencore’s Kamoto mine had not restarted during 2017.

While copper production at the mine started slightly ahead of schedule at the end of 2017, cobalt supply started only in the first quarter of this year, with the cobalt circuit beginning production in the final month of the quarter.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION