Orocobre and Toyota Tsusho approve Japan plant
PERTH (miningweekly.com) – Lithium miner Orocobre and its joint venture (JV) partner Toyota Tsusho Corporation have approved the development of the $77.6-million Naraha lithium hydroxide plant, in Japan.
“We are excited to announce the approval of the Naraha project. The construction of the Naraha lithium hydroxide plant will further cement Orocobre’s position as a global lithium chemicals producer operating at the bottom quartile of the lithium cost curve,” said MD and CE Martin Perez.
“The new hydroxide plant will be the first of its kind in Japan and provides Orocobre product diversification suitable for different battery technologies and the potential for significant margin growth on our primary lithium carbonate being converted to battery grade lithium hydroxide.”
The feedstock for the Naraha plant will be sourced from Orocobre’s Olaraz project’s Stage 2 expansion, which will produce primary grade lithium carbonate.
Some 9 500 t/y of primary grade lithium carbonate will be used to produce 10 000 t/y of battery grade lithium hydroxide.
Orocobre, which will hold a 75% interest in the project, on Friday said that construction of the lithium hydroxide plant would start in the first half of 2019, with commissioning expected in the first half of the 2021 calendar year.
The JV will be entitled to a Japanese government subsidy of some $27.1-million, which will reduce the capital cost of the project to $50.5-million, while operating costs have been estimated at around $1 500/t.
Orocobre noted that the plant will be funded through a combination of term loans and shareholder equity, with Orocobre contributing $6.8-million in equity with Toyota Tsusho contributing $2.3-million.
Sales of the lithium hydroxide will be managed by Toyota Tsusho as exclusive sales agent under a joint marketing arrangement, and the majority of the production is expected to be delivered into the Japanese battery industry.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation