https://www.miningweekly.com

Openpit activities start at Kathleen Valley

3rd February 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Openpit mining operations have started at the Kathleen Valley lithium project, with the project still on track to produce its first product in mid-2024.

ASX-listed Liontown Resources on Friday reported that the first blast at Kathleen Valley had been successfully fired, and the openpit mining operation would generate material for the construction of the run-of-mine pad and tailings storage facility, as well as potential direct shipping ore and a stockpile of mill feed to facilitate the startup commissioning and ramp-up of the process plant.

“Completion of the first blast and commencement of openpit mining operations at Kathleen Valley is a significant milestone for Liontown, signifying our transition from explorer to mining operator,” said Liontown MD and CEO Tony Ottaviano.

“Achieving this milestone ahead of schedule is a testament to the hard work and dedication of the Liontown and Iron Mining Contracting teams. We are excited to be working with the experienced team at Iron Mine Contracting. We have every confidence in their ability to deliver results and look forward to partnering with them to bring our Kathleen Valley lithium project to life.”

The 2.5-million-tonne-a-year Kathleen Valley operation will produce 500 000 t/y of spodumene concentrate, and in year six of operations, Liontown will look to increase the project capacity to 4-million tonnes a year, delivering 700 000 t/y of spodumene concentrate, within six years.

Based on this production scenario, the Kathleen Valley operation is expected to have a mine life of 23 years, and will generate life-of-mine free cash flows of A$12.2-billion.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION