https://www.miningweekly.com

Offshore wind could power Alcoa's Portland smelter in Australia

7th December 2021

By: Reuters

  

Font size: - +

MELBOURNE - Australia's Alinta Energy said on Tuesday it is considering building a A$4-billion ($2.8-billion) offshore wind farm to supply Alcoa Inc's Portland aluminium smelter and the country's east coast grid.

The project is at a very early stage, with Alinta studying a 500 km2 area offshore where it sees potential to tap a strong wind resource. It would need to complete environmental studies, technology and cost studies as well as seek government and community approvals before going ahead.

"We think the wind farm would need to be around 1 000 megawatts to be viable," Alinta's head of project development Kris Lynch said in a statement.

Australia has no offshore wind farms, despite having thousands of kilometres of coastline with strong wind resources. There are more than 10 proposed offshore projects, with a combined capacity of more than 25 gigawatts.

By comparison, as of 2020, there were 7.4 GW of onshore wind farms with 4 GW of capacity due to start construction.

The offshore industry could take off following Australia's passage last month of long-awaited legislation setting a framework for developing offshore wind farms, although regulations flowing from the law still have to be worked out.

If Alinta's Spinifex project went ahead, the Portland smelter, run by Alcoa, could be powered by up to 100% renewables, the companies said.

"This proposal offers an ability to make a step change impact to Portland Aluminium's carbon footprint," Portland Aluminium Smelter Manager Ron Jorgensen said in a statement.

The smelter, the biggest single-power user in the state of Victoria, currently depends on coal-fired power and is looking for ways to decarbonise.

The smelter received government aid and a cheap power deal earlier this year to help it stay open for another five years.

Alinta Energy is owned by private Hong Kong conglomerate Chow Tai Fook Enterprises.

Edited by Reuters

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION