https://www.miningweekly.com

Northern Minerals mulls downstream processing

14th August 2019

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Heavy rare earths producer Northern Minerals has launched a scoping study to investigate downstream processing of mixed rare earths into separated rare earth oxides.

The ASX-listed company has selected US-based K-Technologies to assess the suitability of its proprietary technology to separate intermediate mixed rare earths material from the Browns Range project, in Western Australia, into targeted individual rare earth oxides.

If adopted, the technology would allow Northern Minerals to produce separated rare earth oxides, including dysprosium oxide and terbium oxide, rather than a mixed heavy rare earth carbonate that currently required separation in China, the company said on Wednesday.

“The pilot plant project at Browns Range is all about understanding the potential to become a globally significant heavy rare earths producer,” said MD and CEO George Bauk.

“The investigation of separation technology is a natural extension of the existing pilot plant studies. With everything we do, we are looking at ways of doing it better, more profitably and delivering value to our shareholders.

“With the recent announcement regarding the adoption of ore sorting technology, which will increase production and reduce costs, this exciting new initiative has the potential to take that increased production and convert it into a significantly more valuable and sought-after end product.”

A sample of the Browns Range product will be dispatched to K-Tech in August, and initial testwork results are expected in the December quarter. If the bench-scale testwork and the scoping study are successful, the company will undertake a pilot testwork programme and install the technology as part of the current pilot plant project at Browns Range, to assess the saleability of the differentiated product to an end-user customer base.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION