Northern Graphite plans increased production rate at Ontario project
The Bisset Creek graphite project, in Ontario, could yield at least 20% more production for a relatively modest 6% increase in capital costs, owner Northern Graphite said on Friday, citing an ongoing review of the project by G Mining Services.
The TSX-V-listed company said that higher production of 25 000 t/y would reduce operating costs and would have a positive impact on the net present value (NPV) and internal rate of return (IRR) of Bisset Creek.
The previously filed feasibility study for the project contemplated producing 20 800 t/y of graphite concentrate in Phase 1, which has a capital cost of C$101.6-million. Phase 2 would double production.
A preliminary economic assessment (PEA) encompassing Phase 1 and 2 estimated a pretax IRR of 30.1% and a pretax NPV of $304.9-million, using an 8% discount rate.
“The Bisset Creek project already has attractive economics at current prices and they will be further enhanced by the higher production level. We do not believe this will significantly increase the risk associated with introducing new supply into the market. Most graphite deposits contain large resources, but production must be “right-sized” for markets as some large, low-margin segments are currently unattractive to western producers,” explained CEO Gregory Bowes.
He added that Northern’s strategy was to focus on higher value industrial markets, mainly the US and Europe, where many customers required large and extra-large flake graphite.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation