https://www.miningweekly.com

Noise from deep-sea mining may disrupt whale song, study finds

14th February 2023

By: Reuters

  

Font size: - +

Noise produced by mining the seabed could interfere with whales' ability to communicate with one another, according to a study released on Tuesday, just as plans to start deep-sea mining for battery metals gather pace.

The peer-reviewed study, funded by Umweltstiftung Greenpeace, a foundation arm of the environmental organisation, argues that more research is needed to assess the risk deep-sea mining could pose to large marine mammals.

Several nations and companies are pushing ahead with plans to mine rocks rich in battery metals that blanket vast swathes of the seabed. Mining in international waters may not begin until regulations are agreed at the International Seabed Authority (ISA), a Jamaica-based UN body.

An estimated 22 to 30 cetacean species, including endangered blue whales, can be found in the Clarion Clipperton Zone, an ocean region in the northern Pacific, where the ISA has granted 17 seabed mining exploration licences.

"The sounds produced from mining operations, including from remotely operated vehicles on the sea floor, overlap with the frequencies at which cetaceans communicate," said the study, published in Frontiers in Marine Science.

Mining is likely to produce noise across a range of frequencies that could travel hundreds of kilometres, the study said, interfering with marine mammals' ability to navigate using echolocation and disrupting the messages they send via whale song.

Previous research on ocean noise has found whales can suffer negative effects. One study found man-made noise could increase the risk of humpback whale mothers being separated from their calves, because their normal vocalisations are quiet.

"Far-from-sight impacts on cetaceans could go largely unquantified and unnoticed, along with those on other pelagic predator species that rely on deep ocean areas, including sharks," the authors wrote.

The ISA will host international negotiations in March and July this year as it works towards a July deadline to finalise regulations.

Edited by Reuters

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION