Newmont misses profit estimates on mining disruptions, higher costs
Newmont missed second-quarter profit estimates on lower production and higher costs, sending shares of the world's largest gold miner down on Thursday.
Since early June, Newmont's operations at Penasquito mine in Mexico has remained suspended in response to a labor strike notice, hurting output.
Newmont last month told Reuters it declared a force majeure on deliveries of some metal products from the Mexican mine.
The company withdrew annual outlook for the mine on Thursday and said it could not estimate when the strike would be resolved.
"Newmont will likely find some compromise with the union; however, if there is a prolonged strike, this will be a major headwind in short term," said CFRA Research analyst Matthew Miller.
Shares fell 5.2% in afternoon trading. The stock is down 9.5% so far this year.
Wildfires in Quebec had also temporarily halted operations at the company's Eleonore mine in June.
Newmont's quarterly attributable gold production fell 17.3% to 1.24 million ounces.
It expects production to be higher in the second half of the year, with fourth quarter carrying the most weight.
"Heavy-lifting will be required during the second half of the year to meet the mid-point, with full-year production in the lower half of the guidance range likely," said brokerage TD Cowen Securities.
Newmont expects total annual output between 5.7-million ounces and 6.3-million ounces.
Its all-in sustaining cost for gold, a key metric that reflects total expenses associated with production, rose nearly 23% to $1 472 per ounce in the quarter.
Newmont, in the process of acquiring Australia's Newcrest Mining, expects costs to improve through the remainder of the year.
It posted adjusted profit of 33 cents per share for the quarter ended June 30, compared with analysts' average estimate of 44 cents per share, according to Refinitiv data.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation