https://www.miningweekly.com

Newly built facility to cater for calibration market

18th February 2022

By: Claire O'Reilly

     

Font size: - +

The newly built Water Flow Meter Calibration facility in Alberton, Gauteng, completed last month, has been built solely for the purpose of providing South African National Accreditation System (SANAS) accredited water flow meter calibrations to the South African market, says calibration services provider Unique Metrology MD A J Mathieson.

The facility, owned by Unique Metrology, will cater for flowmeters ranging from 5 mm to 200 mm in the laboratory (lab), and from 50 mm to 1 500 mm on site.

The building project, which began in 2019, took about two years to complete, with the facility now officially having a ‘running’ flow rig. The facility was also constructed in- between the daily running of Unique Metrology’s three other SANAS-accredited pressure, temperature and mass labs.

The facility is just waiting for some upgraded instrumentation technology used to measure temperatures, pressures and atmospheric conditions. The facility is now complete and Unique Metrology has applied to SANAS for ISO:17025 accreditation as a calibration laboratory.

“Many of our potential customers are waiting for the facility to be SANAS-accredited, as their own accreditations require SANAS-accredited calibrations. We are scheduled for our initial SANAS audit in April.”

There are currently only two SANAS-accredited water flow labs in the country, which leaves a lot of room for expansion and some healthy competition, says Mathieson.

Further, using the gravimetric method of calibrating standard flowmeters, although not modern technology, will set Unique Metrology apart from other calibration facilities in the country, he claims.

The gravimetric method is based on the principle of collecting a sample of water, running it through the flowmeter for a measured time and weighing it.

“By using the gravimetric method, we can achieve small uncertainties and offer an extremely accurate calibration.”

Edited by Zandile Mavuso
Creamer Media Senior Deputy Editor: Features

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION