https://www.miningweekly.com

New Century's plans for Mt Lyell take shape

5th April 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Base metals miner New Century Resources on Tuesday said that initial investigations into the Mt Lyell copper mine, in Tasmania, have so far confirmed that the project could be viable.

New Century is undertaking a restart study on the Mt Lyell copper project, after entering into an option agreement over the mine in November of last year.

Mt Lyell has 135-million tonnes of mineral resource containing 1.1-million tonnes of copper and 0.94-million ounces of gold across various underground and openpit deposits. The site includes a tailings storage facility, containing 42-million tonnes of historic tailings, and development work over the last few years has highlighted the potential for tailings retreatment to recover remnant copper, gold and cobalt.

As part of the option agreement, New Century is also investigating the refurbishment or replacement of the existing infrastructure for tailings reprocessing, with subsequent integration of sustainable in-situ ore processing to follow.

New Century said on Tuesday that initial studies at the project had confirmed the suitability of sub-level cave mining for future underground operations, and that existing underground workings would allow for direct access to the ore. The initial work has also confirmed the existing flow sheet suitability, while proposing a partial modernisation of the existing plant.

The restart study would look at establishing logistics networks from the mine to Burnie port, to facilitate global export options, and would look to the availability of renewable hydroelectric power to power the restarted operations.

New Century will also undertake ore reserve definition to convert some of the existing measured and indicated mineral resource into the reserve category, and a mineral resource and ore reserve update is targeted for later this year.

The option agreement over the Mt Lyell project will see New Century spending a minimum of $10-million on the project area over a two-year option period, towards the development, exploration and reimbursement of care-and-maintenance costs.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION