Mt Cattlin starts processing stockpiled ore
PERTH (miningweekly.com) – Lithium miner Galaxy Resources has successfully installed and commissioned ore sorters at the front-end of the Mt Cattlin process plant, in Western Australia, as part of its strategy to prioritise value over volume to preserve resource life and control unit costs.
The miner told shareholders that operations at Mt Cattlin had resumed on schedule during February after the planned summer outage, with the front-end optical sorters successfully installed and commissioned to upgrade low-grade stockpiled ore.
The stockpiled ore at Mt Cattlin is expected to contribute some 40% of throughput in 2020 allowing mining volumes to be reduced. Galaxy noted that mining costs associated with the stockpiled ore has already been expensed, assisting to control unit operating costs.
Galaxy is targeting a lithium concentrate production of between 14 000 t and 17 000 for the first quarter of 2020, following the restart of operations, which the company said would be sufficient to meet its contractual terms.
Meanwhile, Galaxy on Monday said that 33 000 t of lithium concentrate had been shipped last week indicating that processing facilities in China were slowly resuming activities since the disruption caused by the Coronavirus.
The company said that it was monitoring the situation and was in regular contact with customers.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation