https://www.miningweekly.com

Micromine releases new tools for enhanced geological and resource modelling 

31st May 2022

     

Font size: - +

Micromine's industry-leading exploration and resource estimation solution has just got better with its latest version, Micromine Origin 2022.5. 

The enhanced functionality of the company's flagship product is led by three vital brand new tools to equip exploration and resource geologists with even greater confidence in their geological decisions. 

At the click of a few buttons, users can improve the accuracy of their resource estimates by effortlessly integrating real deposit geometry into their estimations with the new Structural Trend tool. 

The new Vein Network tool facilitates all veins to be modelled in a single step, mitigating the typical time-consuming macros and manual boolean operations. This provides an ideal solution, especially when modelling vein deposits with multiple loads or complex intrusion-style deposits. 

Due to the high risk for over or underestimation, Micromine Origin 2022.5's new Indicator Grade Shell tool mitigates estimation risk and prevents domain errors by providing an unbiased and accurate method to represent grade domains. 

"Micromine has always been the tool of choice for explorers worldwide. Therefore, a significant focus on the 2022.5 release has been on strengthening our geological and resource modelling tools to ensure we remain at the forefront of mining software," said Micromine's Chief Strategy and Product Officer, Kiril Alampieski. 

"The three key new tools, amongst the other new tools featured in this release, are instrumental in making life easier. Essentially, we want geologists to be able to prospect smarter and model faster," he added. 

There's also a boost in performance efficiency with Micromine Origin 2022.5, including 3D GIS, block modelling, and charting. 

"Regarding wireframes, there's a 90% loading and unloading speed improvement, and wireframe sets with shaded draw styles now render over 100x faster. Furthermore, the Implicit Modelling tool's 'points per sphere' are auto calculated, resulting in up to 65% performance improvements and more precise outputs," said Dr Alampieski. 

Micromine Origin has three scalable and cost-effective subscription plans to cater to users in the early exploration stage through advanced resource estimation needs. 

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION